MIL-DTL-62739A(AT)
TABLE II. Verification methods - Continued.
Title
Requirements
Verification
I/O, MRD, & OEN-Q
3.3.3.2
4.2.3.3.2
isolation
Display driver outputs
3.3.4
4.2.3.4
Clock clear
3.3.5.1
4.2.3.5.1
Q pulse
3.3.5.2
4.2.3.5.2
Clock count & latch
3.3.5.3
4.2.3.5.3
ATE test 1/
3.3.6
4.2.3.6
Interface requirements
3.4
4.2.4
PWA envelope
3.4.1
4.2.4.1
Ownership & support
3.5
4.2.5
requirements
Interchangeability
3.5.1
4.2.5.1
Identification marking
3.5.2
4.2.5.2
Operating environment
3.6
4.2.6
requirements
Temperature
3.6.1
4.2.6.1
Fungus
3.6.2
4.2.6.2
Shock
3.6.3
4.2.6.3
Vibration
3.6.4
4.2.6.4
1/ Not required unless specified (see 6.2).
4.2 Verification methods. The types of verification methods included in this section are
visual inspection, measurement, sample tests, full-scale demonstration tests, simulation, modeling,
engineering evaluation, component properties analysis, and similarity to previously-approved or
previously-qualified designs.
4.2.1 Verification alternatives. The manufacturer may propose alternative test methods,
techniques, or equipment, including the application of statistical process control, tool control, or
cost-effective sampling procedures, to verify performance. See the contract for alternatives that
replace verifications required by this specification.
4.2.2 Inspection conditions. Unless otherwise specified herein, all inspections shall be
performed under the following standard (room) ambient conditions:
a. Temperature: 77 + 18°F (25 +8°C).
b. Relative humidity: Uncontrolled room ambient.
c. Atmospheric pressure: Site pressure.
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business